HomeMy WebLinkAbout0125138-Plumbing (sump pump)
e
OSHKOSH
ON THE WATER
Job Address 1723 SOUTHLAND AVE
CITY OF lsHKOSH
PLUMBING PERMIT -AP1L1CATION AND REC?RD
Owner JOYCE M HOEFT
Category ~~eSidential-lnterior
Water Softner Wait. St.
Local Waste Ice Ch st
Clothes Wshr Exam ink
Bidet Sculry Sink
Beer Tap Hand ink
Lab Sink Plaste~ Sink
Sterilizer Surge ns Sink
Dip Well F Prep Sink
Drink Ftn Serv S nk
Contractor SAMMONS PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature SFR / Replace sump pump. **DEBIT ACCT**.
of Work
Shamp Sink
FlrlWst Sink
Catch Basin'
Wash Ftn
Urinal
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Valuation
_ $25.00 0 Permit Voided I
Issued By
$300.00 Plan Approval
~
$0.00 Permit Fee
In the performance of this work, I agree to perform all work pursuant to rules gov rning the described construction. :
While the City of Oshkosh has no authority to enforce easement restrictions of w ich it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges th permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such ctivity.
Signature Date
Agent/Owner
Address 522 W. MURDOCK AVE
Telephone Number 231-9880
OSHKOSH
WI
No 125138
Create Date 06/04/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Parcelld #
0612300000
Date 06/05/2007
To schedule inspections please call the Inspection Request line at 36.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building i Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business da from the time the project is ready.