HomeMy WebLinkAbout0125152-Plumbing (toilet)
e
OSHKOSH
ON THE WATER
Job Address 1345 MARICOPA DF
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
PLUMBING PERMIT -APPLICATION AND RECORD
No 125152
Owner KATHLEEN M SCHOENROCK
Create Date 06/04/2007
Category 410 - Residential-Interior
Plan
Bathtub Shower Water Softner Wait. St. Shamp Sink Coffee Maker
- - - - - -
Whirlpool Floor Drain Local Waste - Ice Chest FlrlWst Sink Int Grease Trap
- - - - -
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
- - - - - -
Toilet 1 Disposal Bidet Sculry Sink Wash Ftn RPZ Valve
- - - - - -
Res. Sink Dishwashel Beer Tap Hand Sink Urinal Eye Wash Statn
- - - - - -
Bar Sink Sump Pum Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
- ~ - - - -
Water Heater Classrm Sir Sterilizer Surgeons Sink Ice Maker Deduct Meters
- - - - - -
Site Drain Breakrm Sir Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
- - - - - -
Roof Drain Ejector/Grin Drink Ftn Serv Sink Soda Disp
- - - - -
Misc.
Fixtures -
Use/Nature SFR / Replace toilet. * DEBIT ACCT**.
of Work
Size
Material
Type
#
Conn. Type
San ary Sewer
Stor n Sewer
Wat r Service
Parcelld #
1312520000
Valuation
Issued By
$450.00 Plan Approval
-~')
$0.00 Permit Fees
$25.00 0 Permit Voided I
Date 06/05/2007
In the performance of this work, I a ree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no uthority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application .,jthin an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure a y necessary approvals before starting such activity.
Signature
Date
Address 522 W. MURDOCK AV
Agent/Owner
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections pie. e call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Servi e, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified ot erwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is I ot performed within two business days from the time the project is ready.