Loading...
HomeMy WebLinkAbout0125142-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 212 IDA AVE Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work CITY OF OSHKOSH No 125142 PLUMBING PERMIT - APPLICATION AND RECORD I Owner KURT A1DENISE HEISER Create Date 06/04/2007 $900.00 Plan Approval 0/771/0 Category 411 - Residential-Water Heaters Plan Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink . Coffee Maker Local Waste Ice Chest FlrlWst Sink ' Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain ~ Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp SFR / Replace gas water heater and studor on lavatory. **DEBIT ACCT**. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0704470000 Valuation Issued By $0.00 Permit Fees $25.00 0 Permit Voided I I Date 06/05/2007 I III the performance of this work, I agree to perform all work pursuant to rules governing the described construction.. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at 236-5128noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain e'ntry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.