Loading...
HomeMy WebLinkAbout0125178-Building (fireplace) e OSHKOSH ON THE WATER Job Address 3179 HAYWARD AVE CITY OF OSHKOSH No 125178 BUILDING PERMIT - APPLICATION AND RECORD I Owner MICHAEL J BRECHLlN/L1SA A PEPPLER Create Date 06/04/2007 Designer Contractor CHET WESENBERG ARCHITECHT LLC Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Garage Sq.Ft. Sq. Ft. Sq. Ft. Rooms Height Ft. D Projection I Unfinished/Basement Finished/Living' Bedrooms Stories Canopies Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR/ Installing a gas fireplace in the finished basement and insulating and drywalling the attached garage. of Work HV AC Contractor Plumbing Contractor SBS PLUMBING LLC Electric Contractor Foes, valU~'500.00 Issued By: Plan Approval $0.00 Permit Fee Paid $60.00 Park Dedication $0.00 Date 06/05/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1342930000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction, While the City of Oshkosh has no authority to enf c easement restrictions of which it is not a party, if you perform the work described in this permi Iica ion with' n ea nt, the City strongly urges the permit applicant to contact the easement holder(s) and to s , e. ef re starting such activity. ~'-;:. Signature I' / Date 6~~ '7 / r Address 3162 HAYWARD AVE WI 54904 - 7447 Telephone Number 920-230-4900 To schedule inspections please call the Inspection Request line at 236-5128 noting the Addre~s, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.