Loading...
HomeMy WebLinkAbout0125150-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 617 W 7TH AVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JOHN E LIPPERT Category 411 - Residential-Water Heaters Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Gri nd Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp No 125150 Create Date 06/04/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs SFR / Replace gas water heater. **DEBIT ACCT**. i Size Material Type # COrln.Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0601790000 Valuation IssUled By $600.00 Plan Approval (jYyyv:; $0.00 Permit Fees $25.00 0 Permit Voided I Date 06/05/2007 I In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the Elasement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH WI 54901 - 2298 Telephone N~mber 231-9880 To schedule inspections please call the Inspection Request line at 236-5128 noting the Addre~s, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.