Loading...
HomeMy WebLinkAbout2007-Building VOID e OSHKOSH ON THE WATER Job Address 3245 S WASHBURN ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 124266 VOID Owner BERGSTROM FOX VALLEY INC Contractor REINHOLD SIGN SERVICE INC Create Date 04/05/2007 Desiigner Robert Ott Category 254 - Signs Plan TYPEI o Building . Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfilllished/Basement Sq. Ft. Sq. Ft. Sq. Ft. Rooms Height 40 Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood . Other Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain o Height Permi~ # Structures Park Dedication # Dwelling Units 1 Use/Nature ~uto Dealership / Remove existing ground & LED sign and replace with new ground & LED sign for Bergstrom Auto.* UL #GR283636. of Work Note: All parts of the sign shall meet the Zoning District Setback requirements. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $100,000.00 Plan Approval $0.00 Permit Fee Paid $388.00 P'!rk Dedication $0.00 Issued By: Date 04/16/2007 FinaIlO.P. 00/00/0000 ~ Permit Voided I Parcelld # 1365010000 Iln the performance of this work I agree to perform all work pursuant to rules goveming the described construction, While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature I Date Agent/Owner Address 2070 S HOLMGREN WAY GREEN BAY WI 54304 - 0000 Telephone Number 920-494-7161 TOI schedule inspections please call the Inspection Request line at 236-5128 noting the Address; Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone NlIImber. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.