HomeMy WebLinkAbout2007-Building VOID
e
OSHKOSH
ON THE WATER
Job Address 3245 S WASHBURN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No 124266
VOID
Owner BERGSTROM FOX VALLEY INC
Contractor REINHOLD SIGN SERVICE INC
Create Date 04/05/2007
Desiigner
Robert Ott
Category
254 - Signs
Plan
TYPEI
o Building
. Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfilllished/Basement
Sq. Ft.
Sq. Ft.
Sq. Ft.
Rooms
Height
40 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
. Other
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain
o
Height Permi~
# Structures
Park Dedication
# Dwelling Units
1
Use/Nature ~uto Dealership / Remove existing ground & LED sign and replace with new ground & LED sign for Bergstrom Auto.* UL #GR283636.
of Work Note: All parts of the sign shall meet the Zoning District Setback requirements.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$100,000.00 Plan Approval
$0.00 Permit Fee Paid
$388.00 P'!rk Dedication
$0.00
Issued By:
Date 04/16/2007
FinaIlO.P. 00/00/0000
~ Permit Voided I
Parcelld # 1365010000
Iln the performance of this work I agree to perform all work pursuant to rules goveming the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature I Date
Agent/Owner
Address 2070 S HOLMGREN WAY
GREEN BAY
WI 54304 - 0000 Telephone Number 920-494-7161
TOI schedule inspections please call the Inspection Request line at 236-5128 noting the Address; Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
NlIImber. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.