HomeMy WebLinkAbout0125103-Plumbing (water heater)
CITY OF OSHKOSH No
e
OSHKOSH
ON THE WATER
Job Address 1000-1002 OREGON ST
Contractor MOREMAN PLBG & HTG SERVICE INC
PLUMBING PERMIT - APPLICATION AND RECORD
I
125103
06/04/2007
Owner 1000/1002 OREGON STREET LLC Create Date
COMM (1000-Suite A) / Replace gas water heater. **DEBIT ACCT**.
i
:
I
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0302150000
Category 441 - Industrial-Water Heaters
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature
of Work
Valuation
$600.00 Plan Approval
a~
$0.00 Permit Fees
I
$25.00 0 Permit Voided I
Issued By
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Date 06/04/2007
i
In the performance of this work, I agree to perform all work pursuant to rules governing the described constructiol').
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact th~
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address PO BOX 1325 OSHKOSH WI 54903 - 1325 Telephone Number 231-9191
To schedule inspections please call the Inspection Request line at 236-5128 noting the Addr~ss, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.