Loading...
HomeMy WebLinkAbout0125098-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 1856 MINNESOTA ST CITY OF OSHKOSH No 125098 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump 1 Classrm Sink Breakrm Sink Ejector/Grind Owner RANDALL S SCHMIEDEL Create Date 06/04/2007 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin' Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec 1 Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor WELLNITZ PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By Install electric water heater, ACW and ACW standpipe. , Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1405310000 $3,000.00 Plan Approval $0.00 Permit Fees $25.00 0 Permit Voided I Date 06/04/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner APPLETON WI 54913 - 7924 Telephone N~mber (0)231-7390 Address 4810 AMBERWOOD LN To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.