Loading...
HomeMy WebLinkAbout0125117-Building (entrance door sign) o OSHKOSH ON THE WATER Job Address 400-430 N KOELLER ST CITY OF OSHKOSH No 125117 BUILDING PERMIT - APPLICATION AND RECORD Owner DUMKE & ASSOCIATES LLC Create Date OS/24/2007 Contractor JONES SIGN COMPANY INC Designer Category 254 - Signs Plan Type o Building . Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures ' o Use/Nature 30 N Koeller - Install an ID sign on exterior entrance door 14"x22". of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $150.00 Plan Approval $0.00 Permit Fee Paid $25.00 P~rk Dedication $0.00 Issued By: Date 06/04/~007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1611220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y necessary a",ovajs before starting such activity. Signature t:'lL C L ,Date C. $1"0) Agent/Owner DE PERE WI 54115 - 0000 Telephone Number 920-983-6700 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.