Loading...
HomeMy WebLinkAbout0125101-Building (enclose porch) Ie OSHKOSH ON THE WATER Job Address 1622 BOWEN ST CITY OF OSHKOSH No 125101 BUILDING PERMIT - APPLICATION AND RECORD I Owner MRlMRS CLAYTON D HILAND Create Date 06/04/2007 Designer Contractor KLEIN'S HOME IMPROVEMENT Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Rooms Height Ft. o Projection I Bedrooms Stories Canopies Baths Signs Zoning Unfinished/Basement Sq.Ft. Finished/Living Sq.Ft. Sq. Ft. Garage Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication o # Structures o # Dwelling Units Use/Nature SFRI Enclose the front porch" under the existing roof and adding a new landing a stairs to the side. EI~ctrical will be installed to mee of Work lighting and outlet spacing requirements. i HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $53.00 Pprk Dedication $0.00 Issued By: ~ Date 06/04/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1510990000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu:e;a cessary approvals before starting such activity. Signature .~ / I Date/< b -ll-6-7 Address PO BOX 702 AgenUOwner OSHKOSH WI 54903 - 0000 Telephone Number I (920) 231-5301 HOM I To schedule inspections please call the Inspection Request line at 236-5128 noting the Addre~s, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.