HomeMy WebLinkAbout0125101-Building (enclose porch)
Ie
OSHKOSH
ON THE WATER
Job Address 1622 BOWEN ST
CITY OF OSHKOSH No 125101
BUILDING PERMIT - APPLICATION AND RECORD
I
Owner MRlMRS CLAYTON D HILAND Create Date 06/04/2007
Designer
Contractor KLEIN'S HOME IMPROVEMENT
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. o Projection I
Bedrooms Stories Canopies
Baths Signs
Zoning
Unfinished/Basement
Sq.Ft.
Finished/Living
Sq.Ft.
Sq. Ft.
Garage
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Occupancy Fee
$0.00 Flood Plain
Height Permit
Park Dedication
o
# Structures
o
# Dwelling Units
Use/Nature SFRI Enclose the front porch" under the existing roof and adding a new landing a stairs to the side. EI~ctrical will be installed to mee
of Work lighting and outlet spacing requirements.
i
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$5,000.00 Plan Approval
$0.00 Permit Fee Paid
$53.00 Pprk Dedication
$0.00
Issued By:
~
Date 06/04/2007 Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1510990000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu:e;a cessary approvals before starting such activity.
Signature .~
/
I Date/< b -ll-6-7
Address
PO BOX 702
AgenUOwner
OSHKOSH
WI 54903 - 0000
Telephone Number
I
(920) 231-5301 HOM
I
To schedule inspections please call the Inspection Request line at 236-5128 noting the Addre~s, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.