Loading...
HomeMy WebLinkAbout0125116-Plumbing o OSHKOSH ON THE WATER Job Address 1635 W 20TH AVE CITY OF OSHKOSH No 125116 PLUMBING PERMIT - APPLICATION AND RECORD ! Owner LEONARD GITERESA T SCHMICK Create Date 06/01/2007 Category 440 - Industrial-Interior Plan Contractor L.C. PLUMBING INC. Bathtub Whirlpool Lavatory ToilE~t Res. Sink Bar Sink Water Heater Site Drain Roolf Drain Misc:. Fixtures Use/Nature of Work Valuation Issued By , i Shamp Sink '_ FlrlWst Sink' !- Catch Basin Wash Ftn Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Shower Water Softner Wait. St. Floor Drain Local Waste Ice Chest 2 Lndry Tray Clothes Wshr Exam Sink Disposal Bidet Sculry Sink 1 - Dishwasher Beer Tap Hand Sink 2 Sump Pump Lab Sink Plaster Sink Classrm Sink Sterilizer Surgeons Sink Breakrm Sink Dip Well F Prep Sink 1 - Ejector/Grind Drink Ftn 0 Serv Sink 0 Tea brewer Urinal Standp Rec i Ice Maker Gar Drain 1- Soda Disp 2 , Convert Wendy's into new Subway. T Size Material Type # Corin. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1323200000 $2,000.00 Plan Approval $0.00 Permit Fees $84.00 0 Permit Voided I I Date 06/04/2007 , In the performance of this work, I agree to perform all work pursuant to rules governing the described construction; While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s d to secure a ecessary approvals before starting such activity. Signature ,6" ~ -0 ) . Date Agent/Owner Address N7012 ST RD 49 FREEMONT WI 54940 - 0000 Telephone N~mber 1-920-867-5051 To schedule inspections please call the Inspection Request line at 236-5128 noting the Addre$s, Permit Number, Type of Ilnspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone INumber. Unless specified otherwise, we will assume the project is ready at the time the requ~st is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.