Loading...
HomeMy WebLinkAbout0125073-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 1115 POWERS ST Contractor PAUL J FARIS PLUMBING LLC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn No 125073 Owner JACQUELINE R STADTMUELLER LIFE JSTATE Create Date 06/01/2007 I I Category 411 - Residential-Water Heaters Wait. S1. Shamp Sinkl l- Ice Chest FlrlWst Sink: Exam Sink Catch Basini- I- I Sculry Sink Wash Ftn Hand Sink Urinal Plaster Sink Standp Rec Surgeons Sink Ice Maker I I- F Prep Sink Gar Drain Serv Sink Soda Disp Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs i- i- Install new gas water heater. c I I i Size Material Type # Co~n. Type Sanitary Sewer i Storm Sewer Water Service Parcelld # , 1109580000 Valuation Issued By $600.00 Plan Approval i $25.00 0 Permit;Voided I I I $0.00 Permit Fees Date 06/01/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.' While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfor+ the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the C easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N4571 SHEEHAN LAKE LN CAMPBELLSPORT WI 53010 - 1456 Telephone Number 920-979-8602 I To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain eritry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the reque$t is received. Work may continue if the inspection is not performed within two business days from the time the project Is ready. I I I