HomeMy WebLinkAbout0125083-Plumbing (water heater)
o
OSHKOSH
ON THE WATER
Job Address 1400 S KOELLER ST
Owner IHOP REAL ESTATE LLC
No 125083
Create Date 06/01/2007
Contractor SOPER PLUMBING
Category 441 - Industrial-Water Heaters
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Replace water heater. "'Debit Account
of Work
Valuation
Issued By
Shower Water Softner Wait. St.
Floor Drain Local Waste Ice Chest
Lndry Tray Clothes Wshr Exam Sink
Disposal Bidet Sculry Sink
Dishwasher Beer Tap Hand Sink
Sump Pump Lab Sink Plaster Sink
Classrm Sink Sterilizer Surgeons Sink
Breakrm Sink Dip Well F Prep Sink
Ejector/Grind Drink Ftn Serv Sink
Size
Material
I
Shamp Sinki
1-
FlrlWst Sink'
i-
Catch Basin
Wash Ftn i-
Urinal 1-
Standp Rec i
Ice Maker I-
I-
Gar Drain
i-
Soda Disp I
,-
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Sanitary Sewer
Storm Sewer
Water Service
$4,250.00 Plan Approval
$0.00 Permit Fees
Type
#
Co~n. Type
Parcel Id #
1308500700
I
$25.00 D PermitlVoided I
I
I
Date 06/01/2007
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.!
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
. !
described in this permit application within an easement, the City strongly urges the permit applicant to contact the '
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
I
Address 2225 BURNWOOD DR OSHKOSH WI 54902 - 0000 Telephone Number 426-2151
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain e~try), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the reque~t is received. Work may
continue if the inspection is not performed within two business days from the time the project ~s ready.
!
I
I