HomeMy WebLinkAbout2007-Building (front stoop roof)
o
OSHKOSH
ON THE WATER
Job Address 3780 PURPLE CREST CT
CITY OF OSHKOSH No
125003
BUILDING PERMIT - APPLICATION AND RECORD
Owner DONALD L BANGERT JR Create Date
OS/29/2007
Designer
Contractor J & C CONSTRUCTION
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Canst:
Size
Unfinished/Basement
Sq.Ft.
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
UselNature SFRI 4' x 4' roof over front stoop* the roof shall be anchored to the front stoop to resist uplift.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
$1,200.00 Plan Approval
Issued By:
~
Date OS/29/2007 Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1261410000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to S,fCUl;y a?'{ ~ffcessary approvals ~~~~~r~ starting such activity.
Signature~ U4-j)~~ Date K 5/c}C;/O'1
II ' 1 f
f/ 1/. Agent/Owner
Address 425 E WISCONSIN AVE APPLETON WI 54911 - 0000 Telephone Number 920-832-3971
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Ilnspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.