Loading...
HomeMy WebLinkAbout0125017-Building (siding) e OSHKOSH ON THE WATER Job Address 1039 ALGOMA BLVD CITY OF OSHKOSH No 125017 BUILDING PERMIT - APPLICATION AND RECORD Owner GRADY D/KIMBERL Y BULLINGTON Create Date OS/29/2007 Designer Contractor LETT SIDING & TRIM Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zonillg Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. - - Finished/Living Sq.Ft. Bedrooms Stories Garage Sq.Ft. Baths - Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 D Projection I Canopies Signs Use/Nature SFRI Remove and replace siding* on the house. No structural or electrical work. of Work HV AC Contractor Plumbing Contractor Electric Contractor Foes, vaIUall~. Issued By: $0.00 Permit Fee Paid $67.00 Park Dedication $0.00 $6,500.00 Plan Approval Date OS/29/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0507020000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure a necessary approvals efore starting such activity. Signature ~ Date ~,;I€'6 920-233-4144 Address 5737 CLEVEDON LN Agent/Owner OSHKOSH WI 54904 - 9729 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may (:ontinue if the inspection is not performed within two business days from the time the project is ready.