HomeMy WebLinkAbout0124986-Building (deck)
.
l'P'
.e
OSHKOSH
ON THE WATER
Job Address 308 W BENT AVE
CITY OF OSHKOSH No 124986
BUILDING PERMIT - APPLICATION AND RECORD
Owner GARY UJAMIE L KASARSKY Create Date OS/25/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
TYPEl
. Building
o Sign
o Canopy
o Fence
o Raze
Zoniing
Class of Const:
Size
U nfj nished/Basement
Sq.Ft.
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
o Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier
o Treated Wood
o Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature ~FRI Constructing a 16' x 16' deck" off the side of the house the deck shall be no more then 12" above grade and be a minimum of 24"
of Work rom the side property line. Center pier diameter 14", corners 8" and middle sides will 10".
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Issued By:
~
Date OS/25/2007 Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1502750000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu!,;!,.anytecessary a ,to'J I before starting such activity.
/" / ,~
Signature / /" >'
/'~-----:>// ,.'
/ ,.r
Addres~.--&(a\V BENT AVE
Date
~5~~~7
/
WI 54901 - 2930
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Ilnspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.