Loading...
HomeMy WebLinkAbout0124986-Building (deck) . l'P' .e OSHKOSH ON THE WATER Job Address 308 W BENT AVE CITY OF OSHKOSH No 124986 BUILDING PERMIT - APPLICATION AND RECORD Owner GARY UJAMIE L KASARSKY Create Date OS/25/2007 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan TYPEl . Building o Sign o Canopy o Fence o Raze Zoniing Class of Const: Size U nfj nished/Basement Sq.Ft. Sq. Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation o Poured Concrete 0 Floating Slab o Concrete Block . Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature ~FRI Constructing a 16' x 16' deck" off the side of the house the deck shall be no more then 12" above grade and be a minimum of 24" of Work rom the side property line. Center pier diameter 14", corners 8" and middle sides will 10". HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By: ~ Date OS/25/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1502750000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secu!,;!,.anytecessary a ,to'J I before starting such activity. /" / ,~ Signature / /" >' /'~-----:>// ,.' / ,.r Addres~.--&(a\V BENT AVE Date ~5~~~7 / WI 54901 - 2930 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Ilnspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.