HomeMy WebLinkAbout0124946-Building (bathroom remodel)
e
OSHKOSH
ON THE WATER
Job Address 1640 ELMWOOD AVE
CITY OF OSHKOSH No 124946
BUILDING PERMIT - APPLICATION AND RECORD
Owner GAIL F ANDERSON Create Date OS/23/2007
Contractor GEFFERS REMODELING
Designer
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Remodeling the existing bathroom. 'Only the lower half of the walls will be opened. An exhaust fan is required to vent to the
of Work exterior per code requirements.
HV AC Contractor
Plumbing Contractor D R GLAZE PLUMBING
Electric Contractor DENNIS P BRENNAN
Fees, valUU
Issued By: lr-
$3,200.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Date OS/23/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1202060000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and t~u y necessary approvals before starting such activity.
Signature '-V Date
Address
208 E SNELL RD
OSHKOSH
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.