Loading...
HomeMy WebLinkAbout0124909-Plumbing G OSHKOSH ON THE WATER Job Address 1802 JEFFERSON ST CITY OF OSHKOSH No 124909 PLUMBING PERMIT - APPLlCA lION AND RECORD Owner SFJV 2005 LLC Create Date OS/22/2007 Category 410 - Residential-Interior Contractor MOREMAN PLBG & HTG SERVICE INC Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install new plumbing fixtures. of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Valuation Sanitary Sewer Storm Sewer Water Service Size Material Type # Cohn. Type $1,500.00 Plan Approval Parcelld # 1503590000 $0.00 Permit Fees $25.00 0 Permit Voided I Date OS/22/2007 Issued By ... In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 Address PO BOX 1325 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.