Loading...
HomeMy WebLinkAbout0124916-Building e OSHKOSH ON THE WATER Job Address 2415 HICKORY LN CITY OF OSHKOSH No 124916 BUILDING PERMIT - APPLICATION AND RECORD Owner DANIEL M COTTER Create Date 05/17/2007 Designer Contractor OWNER Category 161 - Wrecking Residential Dwellings Plan Type o Building o Sign o Canopy o Fence . Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o UselNature SFRI Razing the existing house' and leaving the existing detached garage. A new home will be built on the same site. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $3,000.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $39.00 Park Dedication $0.00 Date OS/22/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1518678000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement 110Ider(s) and.JQ~~~ any neces~~vals ~efore starting such activity. Signature~ ~ ~ Date X Agent/Owner q),zA,;4j Address 2415 HICKORY LN OSHKOSH WI 54901 - 2521 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.