Transmittal Letter
RECEIVED
\-f-B' 0 8 2007
, ...
.,_. ~ l~'
UosHkoSI-l'WISCONSIN
To: David Patek, P. E.
City of Oshkosh
215 Church Avenue
Oshkosh,VVI54903-1130
Date: February 7,2007 I Project No.: 11-382.030
Attention:
RE: Campbell Creek-Amendment No.3
WE ARE SENDING YOU:
I'8J Attached
o Und~r Sepa~~~,9Qy_~r__~._._._w~.."'_'-"""
11""""\ fE' f;
o Cop'.b'fuett~! :1 ,
y i.. r'.J' , ---._-_.-."".,.-'"
, , . 'r'~-'--" I
I, L... j I .
D samr~~~_:~~J
I CI-j'\,{ ...."L.. "'~C~'f!'" ,r.,
Ii' L. t:. nj \. ,.),-,1
~..._..-._.__"".,....~.;.,~..~,.h ,"".,c.; ,.....~.~~...
~,.,...".,P...-""','.'.,....."....._.w
o Shop Drawings
o Change Order
Copies Date No. Description
2 Amendment No.3 oriqinals siqned bv Strand
.
o Specifications
o Drawings
o Other:
THESE ARE TRANSMITTED as checked below:
o For approval
I'8J For your use
o As requested
o For review and comment
o Approved as submitted
o Approved as noted
o Returned for corrections
o Other
o Resubmit _ copies for approval
o Submit _ copies for distribution
o Return _ corrected prints
David-Sending t~ view and execution by the City. VVe look forward to
assisting th I Y in looking at the 0 Please call
with an estions.
Remarks:
Copy to:
Document7
a great day and stay warm!
),-'1- ':).007
~()'\'\ -. A#-..dr..J 6.....d 4 )~?t"'J Signed
~6"(r6J.~. ~j~
c.c. ~~"i4-r~~.r~n~~J""'~A"--'""=J
::t..wc ~ (Wlt'" Coy ~)
J~}t< (W\.{... ~)
5a.
STRAND
ASSOCIATES, INC.~
ENGINEERS
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet,IL
Louisville, KY
Lexington, KY
Mobile, AL
Columbus, IN
Lancaster, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
www.strand.com
February 7, 2007
City of Oshkosh
215 Church Avenue
Oshkosh, VVI 54903-1130
Attention:
David Patek, P.E., Director of Public VVorks
Re: Agreement for Planning Services-Amendment No.3
North Branch Campbell Creek Stormwater Management Plan
This is Amendment No. 3 to the referenced Agreement for Planning Services dated
May 26, 2005.
ADD under Scope of Services:
A. Topographic Survey
"5. ENGINEER shall perform field survey of the ditch on the west side of HVVY 41
from 700 feet south of the Dickinson Avenue and VVashburn Street intersection
to 200 feet south of Allerton Drive, the ditch on the south side of the railroad
tracks from HVVY 41 to the storm sewer outfall located on Universal Drive, and
culverts and storm sewer structures located along the above mentioned corridor.
In addition, ENGINEER will survey the storm sewer mainline from the
Universal Drive outfall southerly to the beginning of the mainline located at the
intersection of STH 44 and VVaukau Avenue as well as approximately 750 feet
southwest of the intersection. The existing storm sewer, water main, and sanitary
sewer utilities along the proposed storm sewer alignment for Alternative 13 will
also be surveyed."
B. Storm Sewer System Map
"ENGINEER will update the mapping of existing stormwater management
features/facilities within Basin SBB 60.
The following information will be updated on the existing mapping:
VVatershed divides
Major drainage structures
Storm sewer system existing mapping
Recommended Improvements"
C. Analysis of Existing Drainage System
"ENGINEER will expand upon the already created computer models of the existing
North Branch Campbell Creek watershed. The expanded model will include the main
sa.
STRAND
ASSOCIATES, INC.~
ENGINEERS
City of Oshkosh
Page 2
February 7, 2007
line drainage system from Diversion Point 1 to a point approximately 750 feet to the
southwest of the intersection of STH 44 and W aukau Avenue. This includes subdividing
Basin SBB 60 and calculating new drainage areas, time of concentrations, and Runoff
Curve Numbers (ReN). The proposed storm sewer conveyance system along STH 41
(from the Sawyer Creek outfall to Diversion Point 1) that is currently being design by
Strand Associates for the Wisconsin Department of Transportation will be incorporated
into the existing model. The RCN for all HWY 41 land will be adjusted to include the
additional impervious area created from widening the roadways within the WisDOT
right-of-way.
D. Analysis of potential impacts of future development on existing drainage system.
"15. Alternative 12-Analysis of the effect of Alternative 7 by incorporating the
additional drainage system and changes into an updated XPSWMM model as
stated in Section C.
16. Alternative 13-Using the updated model, analysis of the effect of removing the
9th StreetIWashbum Street detention basin from Alternative 12 and including
new detention basin(s) located in the Westhaven Golf Course. The conceptual
layout for this alternative will also include possible locations for recreation
fields, playground areas, shared-use paths, and potential locations for park
pavilions/shelter houses.
17. Alternative 14-Using the updated model, analysis of the effect of removing the
9th StreetlWashbum Street detention basin from Alternative 12 and
incorporating a new detention basin located east of the STH 44IW. Waukau
Avenue intersection (two parcels totaling 5.03 acres).
18. Alternative IS-Using the updated model, analysis of the effect of removing the
9th StreetIWashburn Street detention basin from Alternative 7 and including a
new long linear detention basin located in the agricultural land located along the
border of the wetland located approximately 750 feet southwest of the
STH 44/W. Waukau Avenue intersection. The detention basin would be
designed to reduce the 100-year proposed flow rate and reduce it to the 2-year
predeveloped flow rate. A base flow would be maintained through the wetlands.
19. Alternative 16-Using the updated model, analysis of the effect of removing the
9th StreetIWashburn Street detention basin from Alternative 12 and inclusion of
a combination of Alternatives 12 to 15. If an alternative basin is chosen in
addition to those considered in Alternatives 13 through 15, the OWNER will
provide any survey required for this analysis.
20. Single analysis of pipe sizes to convey the lO-year storm on the North Branch
Main Line downstream of Landmark Plaza and the Main Stem to Campbell
Creek with the recommended alternative in place.
21. Pipe capacity analysis of the entire modeled system to show the pipe capacity
according to design storm in a GIS figure with the recommended alternative in
place.
JHL:mro\R:\DocumentsIAgreementsIOshkoshICampbeIICreekStrmwtrPIn.2007IAmdI1-382-030.AmdJ.doc
sa.
STRAND
ASSOCIATES,INc,e
ENGINEERS
City of Oshkosh
Page 3
February 7,2007
22. Analysis and a GIS figure showing the changes in diversion at Diversion
Points 1,2, and 3 with the recommend alternative in place.
Alternatives 1 through 11 will not be rated against these additional options. Rather,
Alternatives 12 through 16 will be rated for cost and effectiveness against only
Alternative 7, the previously recommended alternative."
E. Prepare Stormwater Management Plan
"ENGINEER will prepare a PLAN AMENDMENT to the PLAN in draft and final
formats. Three copies of the draft PLAN AMENDMENT and ten copies of the final
PLAN AMENDMENT will be submitted to the OWNER. This PLAN AMENDMENT
will include:
1. An updated Storm Sewer System Map.
2. Recommendations of measures to address the removal of the 9th Street and
Washburn Street detention basin originally contemplated as Alternative No.7
based on an alternatives analysis (Alternatives 12 through 16), opinions of
probable cost, and an implementation PLAN."
F. Meetings
"ENGINEER will attend four additional meetings with OWNER as follows:
4. Kickoff meeting with OWNER
5. Meeting with OWNER to discuss the draft PLAN AMENDMENT.
6. Meeting with OWNER to present the final PLAN AMENDMENT to the Public
Works Committee.
7. Meeting with OWNER to attend a City Council Meeting."
CHANGE under Compensation the lump sum fee from $59,900 to "$121,800."
REPLACE table with the following:
Topographical Survey
Meetings
Stormwater Modeling! Analysis
Stormwater Management Plan
Total Cost
$ 13,500
9,600
68,400
30.300
$121,800
Total
ADD under Schedule: The draft Plan Amendment incorporating the Scope of Services herein
will be completed approximately three and one-half months after Amendment No.3 is signed.
The final draft Plan Amendment will be completed approximately five months after Amendment
No.3 is signed.
JHL:mro \R: \Documents\Agreements\Oshkosh \CampbeIlCreekStrmwtrPln,2007\Amd\ 1-3 82-030.Amd3 .doc
sa.
STRAND
ASSOCIATES, INGot
ENGINEERS
City of Oshkosh
Page 4
February 7,2007
IN WITNESS WHEREOF the parties hereto have made and executed this Agreement.
ENGINEER:
STRAND ASSOCIATES, INC.
/#I~f~
Matthew S. Richards
Assistant Corporate Secretary
OWNER:
CITY OF OSHKOSH
~,t7 ~ /t~"
I5atl Richard A. Wollangk- -
City Manager ~ .
_ _.2 -f'-2&:?C.??
Date
~~~....,'.. JC'kO (} -~-~OO (
, . 1 .' JteCk..l Date
~ City Clerk '
~ru.!J a ML
Edward A. Nokes
City Comptroller
t&A~~
Warren P. Kraft '
City Attorney
JHL:mro IR: \Documents IAgreementslOshkoshlCampbellCreekStrmwtrPln,2007lAmdl1-3 82-030.Amd3 .doc