Loading...
HomeMy WebLinkAboutPW CNT 06-02/Cng Ord #1 sa. STRANO ASSOCIATES ING !- f',.! ~-::; i f',.1 != ~, ,~ :-: 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet, IL Lexington, KY Louisville, KY Mobile, AL Columbus, IN Columbus, OH Indianapolis, IN Milwaukee, WI Cincinnati,OH www.strand.com r RECEIVED APR 1 8 2007 TJafR~~tfBi~~!!~~~,(:^,_~_,:.^ u.. APR 0 4 l~007 DJSPT. OF PUBUC WORKS HKOSH WISCONSIN '.~' To: August Winter & Sons 2323 N. Roemer Road Appleton, WI 54912 J Date: April 2, 2007 I Project No.: /1-382-028 Attention: Norbert Schmidt, P.E. / RE: Oshkosh - Change Order NO.1 / C(/kTv-.c.-t O~-()Z. I I WE ARE SENDING YOU: o Attached o Under Separate Cover o Shop Drawings l8J Change Order o Copy of Letter o Specifications o Drawings o Samples o Other: Copies Date No. Description 4 3/9/07 Revised Page #2 with corrected "hability" to "liability" . THESE ARE TRANSMITTED as checked below: Norb - As discussed, here are the revised signature pages for Change Order No.1. Please sign all four new originals and date them with your original date (3/12/07). I have included a copy of the previous page #2 which shows the need for the change. Please deliver to Steve Brand by Wednesday April 4, 2007 so it can be included in the packet to the council. Thank you and have a great day. 1-ls-Zoo/ Signed j~2'/J ;;]:/h - #~~C! ~ v..J CA. >L~ Jeffrey' au, P.E. ~ Oy~)~ 6f-f~ct..(t.M)1:. ovJo..~~ J~ 6~s . n~S - . S:I@SAI1351--40013821028IWrdltrans040207AW.doc ~ ?2 C-c. 4uj~\t <Jc...'f. (w-I-k Or')...J) c....j 4h (",iJ. "'f';J ) G-:, ~~ (W\-f~ 6t--l~~..Jl) ~ &~ (~~p~ ') o For approval o For your use o As requested o For review and comment Remarks: Copy to: FHe o Approved as submitted o Approved as noted o Returned for corrections l8J Other Signature o Resubmit _ copies for approval o Submit _ copies for distributiion o Return _ corrected prints ~f~6-tt~ +t.IR (Wrl 6t-~u...J sa. STRANO ASSOCIATES. fNG$ ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet,lL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Lancaster, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com March 9, 2007 CHANGE ORDER NO.1 PROJECT: OWNER: CONTRACT: CONTRACTOR: North Side, Snell Road, and Murdock Pumping Station Upgrades City of Oshkosh, Wisconsin 06-02 August Winter & Sons, Inc. Description of Change The following is a listing of the general contractor, subcontractor's, and supplier's various cost additions and deductions for the above contract as recommended by the Engineer. la Provide for removal of a 14-inch stormwater line at ADD Murdock Station. Included is the removal of unsuitable material for the excavation of the new wet well. 1 b Delete 50-cubic-yard allowance for unsuitable DEDUCT foundation material for structures and roads. 1c Delete 50-cubic-yard allowance for unsuitable DEDUCT foundation material for utility trenches Provide 4-inch ductile iron vent to the Snell Road ADD Pump Station. Provide for labor and equipment for removal of the ADD concrete valve vault lid at Snell Road Pump Station. Provide substitution of 60-inch concrete manhole in ADD lieu of 48-inch concrete manhole at Murdock Pump Station. Provide bypass hauling for North Side Pump Station. ADD Includes credits from Lincoln Contractors and August Winter for bypass pumping and reused ductile iron fittings. Delete half (1/2) of Alternative lA Deduct from DEDUCT Contract for suction elbow replacement in North Side Pump Station wet well. Only two suction elbows of the four present were replaced. Id Ie If Ig 1h TOTAL VALUE OF THIS CHANGE ORDER: Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order ADD ADD $ 14,669.00 $ (1,317.00) $ (1,317.00) $ 1,207.90 $ 3,537.80 $ 2,128.00 $ 2,101.00 ($ 2,150.00) $ 18,859.70 $757,835.00 $ 0.00 $ 18,859.70 $776,694.70 . , sa. STRAND ASSOCIATES, INC.~ ENGINEERS CITY OF OSHKOSH-AUGUST WINTER & SONS, INC. CONTRACT NO.06-02, Change Order No.1 Page 2 March 9, 2007 Contract Completion Date Adjustment Original Contract Completion Date Substantial Completion Final Completion May 1, 2007 June 1,2007 None Contract Completion Date Adjustments due to previous Change Orders Contract Completion Date Adjustments due to this Change Order Current Contract Completion Dates including all Change Orders None Substantial Completion Final Completion May 1, 2007 June 1,2007 This document shall become a supplement to the Contract and all provisions will apply hen~to. .---- RECOMMENDED -J ~~ r< ENGINEER- and Associates, Inc. APPROVED /Wu(-~ ;d- CONTRACTOR- gust Winter & Sons, Inc. RECOMMENDEDBYO~R JJ~J Co. ~~ Director of Public WorkS I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under this Change Order. ~.JcPAO Q~ City Comptroller APP~VED A.S T~RM .' C) _- ~ .. ~.~ City Attorney/Assistant City Attorney JSRlrIS:\@SAI\351-400\382\028IWrdlAugustWinter Change OrderslCO I.doc 3/1/07 Date "3;;"2-/0 7 Date f- 3-~oc:>'" Date ~--/,2 ~ 2efJ' :7 Date _4-lB ~deJt5l Date Lj /) :Jen Date ~fFln D te (