HomeMy WebLinkAboutPlumbing Y2-250-0507-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
May 21,2007
McMahon Associates
POBox 1025
Neenah,W154957
Ref: Plumbing Plan Approval:
OMNI Glass & Paint (exterior sanitary sewer and water)
3530 Omni Drive, Oshkosh, WI
Plan ID# Y2-250-0507-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Exterior clean out risers shall be provided frost sleeve protection per COMM 82.35
2. Sanitary sewer service shall be protected from frost per COMM 82.30(11) based on depth of
bury and soil type.
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfu lIy,
Richard Wood,
Plumbing Inspector