Loading...
HomeMy WebLinkAboutPlumbing Y2-250-0507-P ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX ON THE WATER May 21,2007 McMahon Associates POBox 1025 Neenah,W154957 Ref: Plumbing Plan Approval: OMNI Glass & Paint (exterior sanitary sewer and water) 3530 Omni Drive, Oshkosh, WI Plan ID# Y2-250-0507-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. Exterior clean out risers shall be provided frost sleeve protection per COMM 82.35 2. Sanitary sewer service shall be protected from frost per COMM 82.30(11) based on depth of bury and soil type. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfu lIy, Richard Wood, Plumbing Inspector