HomeMy WebLinkAbout0124886-Plumbing (sewer)
e
OSHKOSH
ON THE WATER
Job Address 2800 N MAIN 5T
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
124886
Owner RABIN WORLDWIDE/DALE E BECKER Create Date OS/21/2007
Category 430 - Industrial-Exterior (laterals) Plan Y1-248-0507-P
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest Flr/Wst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor JAY R WAINO EXCAVATING INC
Bathtub
Whirlpool
/
Lavatory
Toilet
Res" Sink
Bar Sink
Water Heater
Site Drain
Roo" Drain
Misc:.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Relay portion of the building sanitary sewer, extending into the building with 6" plastic.
Size Material Type # Conn. Type
Sanitary Sewer 6" Plastic Lateral 1 Relay
Storm Sewer
Water Service
Parcelld #
1519600301
Valuation
Issued By
$2,000.00 Plan Approval
$0.00 Permit Fees
$50.00 D Permit Voided I
Date OS/21/2007
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Sigrnature Date
Agent/Owner
Address POBOX 130
SUAMICO
WI 54173 - 0000 Telephone Number 920-434-1885
To, schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
NLllmber. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.