HomeMy WebLinkAbout2007-Building (windows)
o CITY OF OSHKOSH
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 433 435 N WESTFIELD ST Owner JOHN L FREUND
No
124874
Create Date
05/18/2007
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block o Post o Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
Use/Nature 1435 N Westfield/ Duplex/Installing 12 replacement windows (same size and location), boarding up windows in 2 bedrooms (the bedrooms
of Work will still meet minimum light requirements), and installing vinyl siding on the upper half of the building.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $4,500.00 Plan Approval
Issued By: \ ~>t.J.---
$0.00 Permit Fee Paid
$53.00 Park Dedication
$0.00
Date 05/18/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1611290000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ser1 any ne~sary appro~~.b tarting such activity. ,r:::;~~//'" -s / ,
Signature " F'~ (/' (~Date ~ /(,,/ OJ
;1 .' (
( !/ .
Address 206 W--RIVER DR OMRO WI 54963 - 1060 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.