Loading...
HomeMy WebLinkAbout2007-Building (windows) o CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 433 435 N WESTFIELD ST Owner JOHN L FREUND No 124874 Create Date 05/18/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature 1435 N Westfield/ Duplex/Installing 12 replacement windows (same size and location), boarding up windows in 2 bedrooms (the bedrooms of Work will still meet minimum light requirements), and installing vinyl siding on the upper half of the building. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,500.00 Plan Approval Issued By: \ ~>t.J.--- $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Date 05/18/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1611290000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ser1 any ne~sary appro~~.b tarting such activity. ,r:::;~~//'" -s / , Signature " F'~ (/' (~Date ~ /(,,/ OJ ;1 .' ( ( !/ . Address 206 W--RIVER DR OMRO WI 54963 - 1060 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.