HomeMy WebLinkAbout0124786-Building
e
OSHKOSH
ON THE WATER
Job Address 500-550 S KOELLER ST
CITY OF OSHKOSH No 124786
BUILDING PERMIT - APPLICATION AND RECORD
Owner RIVER VALLEY ONE LLC Create Date 05/15/2007
Designer
Contractor CPM LLC
Category
223 - Alteration Offices, Banks, Professional Plan Y3-1968-0407
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier
o Treated Wood
o Other
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature 1510 S Koeller - Tenant space build out for Citi Financial.
of Work
HV AC Contractor
TOWER MECHANICAL SERVICES INC
Plumbing Contractor TOWER MECHANICAL SERVICES INC
Fees;: Valuatio
$388.00 Park Dedication
$0.00
Electric Contractor
Issued By:
Date 05/15/2007
Final/O.P. 00/00/0000
Parcelld # 0611620000
In the performance of this w rk I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 4318 PLAINFIELD AVE NE STE G
GRAND RAPIDS
MI 49525 -
Telephone Number
616-301-0673
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.