Loading...
HomeMy WebLinkAbout0124818-Building (shed) #'O~ OSHKOSH ON THE WATER Job Address 1677 BERNHEIM ST CITY OF OSHKOSH No 124818 BUILDING PERMIT - APPLICATION AND RECORD Owner PATRICK VITAM MY D CERRONI Create Date 05/16/2007 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Size Sq. Ft. Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Canopies Finished/Living Bedrooms Stories Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood OcclJlpancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI 8' x 10' shed and a 15' x 15' patio. to be constructed in the rear yard. The shed will be placed and anchored to a 10' x 11' slab. of Work Plumbing Contractor HV AC Contractor Electric Contractor $2,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 05/16/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 1332090000 In the performance of this work I agree to perform allwork pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this petriiifappffcatiOnwTfIlIt:9an easement, the CitY y,trongly urges the permit applicant to contact the easement holder(s) and to secure any n.~.~cessa'fylapprova's before s arti~'SuCh activity. e it r- ~ Signature ~__ il- / v'--~ . _'_' '> _.___- Date ~ .5 -I -'c: 7 AgenUOwner Address 1677 BERNHEIM 81' OSHKOSH WI 54904 - 8967 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.