Loading...
HomeMy WebLinkAbout0124783-Building o OSHKOSH ON THE WATER Job Address 2195 STATE ROAD 21 CITY OF OSHKOSH No 124783 BUILDING PERMIT - APPLICATION AND RECORD Owner POMMERENING DEVELOP CORP Create Date 05/15/2007 Designer Contractor CITY OF OSHKOSH Category 285 - Wrecking (Industrial & Commercial Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature Raze and Remove Former Ford dealership building. Portions of the foundations to be removed and portions to remain. Parking lot to be of Work removed by land owner. * Water previously disconnect as part of streeet construction, Sanitary Sewer will be disconnected by Street Dept. City owns building, not the land. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuatio $0.00 Penmit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 05/15/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1621500100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Oshkosh Address WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.