HomeMy WebLinkAbout2007-Plumbing Y1-247-0507-P
~
OJHKOJH
City of Oshkosh
I nspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
May 11, 2007
Michael Lynn
Page Interworks PA
923 Main Street
North Wilkesboro, NC 28659
Ref: Plumbing Plan Approval:
Lowe's of Oshkosh (interior plumbing)
1075 N. Washburn St., Oshkosh, WI
Plan 10# Y1-247-0507-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. All re-circulated hot water lines shall be insulated to maximum heatloss standard per COMM
82.40(5)(b)3
2. This plan review does not satisfy requirements to register cross connection control devices.
Devices required to be tested and certified annually shall be registered with the Department
per COMM 82.20 (1)( c)1 a
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfully,
Richard Wood,
Plumbing Inspector