Loading...
HomeMy WebLinkAbout0124762-Building (2nd floor deck) o OSHKOSH ON THE WATER Job Address 2020 WHITE SWAN DR CITY OF OSHKOSH No 124762 BUILDING PERMIT - APPLICATION AND RECORD Owner MRlMRS DAVID E RIESS Create Date 05/11/2007 Contractor BOB GRIFFIN CARPENTRY Designer Category 142 - Decks, Patios, Ramp~~_______~____~~ Plan Type . Building o Si~rl___ ~__ _ o Canopy o Fence o Raze _.~-~--------~ Zoning Class of Const: Size Unfi nished/Basement Sq. Ft. Rooms Height Ft. - Finished/Living Sq. Ft. Bedrooms Stories - Garage Sq. Ft. Baths - Foundation o Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block . Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures Q.F:r~ection I Canopies Signs o Use/Nature Replacing the 2nd floor deck*-liSlng-fhe-exlstTng piers from the grade level deck. The deck will be 5' x 12'. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1'WPlanApprOval Issued By: ~ $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 -_._,_._~ Date 05/11/2007 Final/D.P. 00/00/0000 o Permit Voided I Parcel Id # 1523580000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se ure any nece sary aR rovals before starting such activity. Signature rrt- - Date S- ~ / / - t/ /' Agent/Owner Address 1955 SKYRANCH AVE OSHKOSH WI 54904 - 0000 Telephone Number 235-4153 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.