HomeMy WebLinkAbout0124762-Building (2nd floor deck)
o
OSHKOSH
ON THE WATER
Job Address 2020 WHITE SWAN DR
CITY OF OSHKOSH No 124762
BUILDING PERMIT - APPLICATION AND RECORD
Owner MRlMRS DAVID E RIESS Create Date 05/11/2007
Contractor BOB GRIFFIN CARPENTRY
Designer
Category
142 - Decks, Patios, Ramp~~_______~____~~
Plan
Type
. Building
o Si~rl___ ~__ _
o Canopy
o Fence
o Raze
_.~-~--------~
Zoning
Class of Const:
Size
Unfi nished/Basement Sq. Ft. Rooms Height Ft.
-
Finished/Living Sq. Ft. Bedrooms Stories
-
Garage Sq. Ft. Baths
-
Foundation o Poured Concrete 0 Floating Slab o Pier o Other
o Concrete Block . Post o Treated Wood
Occupancy Permit Flood Plain Height Permit
Park Dedication # Dwelling Units 0 # Structures
Q.F:r~ection I
Canopies
Signs
o
Use/Nature Replacing the 2nd floor deck*-liSlng-fhe-exlstTng piers from the grade level deck. The deck will be 5' x 12'.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation $1'WPlanApprOval
Issued By: ~
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
-_._,_._~
Date 05/11/2007
Final/D.P. 00/00/0000
o Permit Voided I
Parcel Id # 1523580000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se ure any nece sary aR rovals before starting such activity.
Signature rrt- - Date S- ~ / / - t/ /'
Agent/Owner
Address 1955 SKYRANCH AVE
OSHKOSH
WI 54904 - 0000 Telephone Number 235-4153
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.