Loading...
HomeMy WebLinkAbout0124757-Building (decking) o OSHKOSH ON THE WATER Job Address 1630 MARICOPA DR CITY OF OSHKOSH No 124757 BUILDING PERMIT - APPLICATION AND RECORD Owner KEVIN JITRINA J ANDERSON Create Date 05/11/2007 Designer Contractor OWNER Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature pFRI LATE PERMIT/ Replacing the decking on the existing deck and tops of the guardrails. The steps and guardrails are required to of Work meet current code requirements. HV AC Contractor Plumbing Contractor Electric Contractor $1,600.00 Plan Approval $32.00 Park Dedication $0.00 Fees: Valuation Issued By: l_~ k $0.00 Permit Fee Paid Date 05/11/2007 FinaIlO.P. 00/00/0000 o Permit Voided I Parcelld # 1320320000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure,~ ne~ry approval:~efore starting such activity. -.J I s;gnatu..c ~ Date ';,<:::J>//~7 ,r Agent/Owner ( Address 1630 MARICOPA DR OSHKOSH WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.