HomeMy WebLinkAbout0124757-Building (decking)
o
OSHKOSH
ON THE WATER
Job Address 1630 MARICOPA DR
CITY OF OSHKOSH No 124757
BUILDING PERMIT - APPLICATION AND RECORD
Owner KEVIN JITRINA J ANDERSON Create Date 05/11/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
o Projection I
Finished/Living
Sq.Ft.
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature pFRI LATE PERMIT/ Replacing the decking on the existing deck and tops of the guardrails. The steps and guardrails are required to
of Work meet current code requirements.
HV AC Contractor
Plumbing Contractor
Electric Contractor
$1,600.00 Plan Approval
$32.00 Park Dedication
$0.00
Fees: Valuation
Issued By: l_~ k
$0.00 Permit Fee Paid
Date 05/11/2007
FinaIlO.P. 00/00/0000
o Permit Voided I
Parcelld # 1320320000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure,~ ne~ry approval:~efore starting such activity. -.J I
s;gnatu..c ~ Date ';,<:::J>//~7
,r Agent/Owner (
Address 1630 MARICOPA DR OSHKOSH WI 54904 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.