Loading...
HomeMy WebLinkAbout0121207-Plumbing (interior) G OSHKOSH ON THE WATER Job Address 359 KNAPP ST PLUMBING PERMIT - APPLICATION AND RECORD CITY OF OSHKOSH No 121207 Owner DEL TRITT CONSTRUCTION LLC Create Date 07/14/2006 Plan Contractor J RASMUSSEN PLUMBING INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Category 410 - Residential-Interior Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs NSFRlINTERIOR FOR NEW HOME "debt acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0608701700 3 3 1 Shower 2 Water Softner Wait. St. Shamp Sink Floor Drain 1 Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal 1 Bidet Sculry Sink Wash Ftn - Dishwasher 1 Beer Tap Hand Sink Urinal Sump Pump 1 Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp HOSE BIBS 2 Plan Approval $0.00 $133.00 0 Permit Voided I Valuation ~oo.oo ~ssued By 5vY\ Permit Fees Date 08/22/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 1914 GREENBRIAR TRL Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-233-6747 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.