HomeMy WebLinkAbout0121231-Plumbing (interior)
e CITY OF OSHKOSH No 121231
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2317 JEFFERSON ST Owner SHOWCASE CUSTOM HOMES Create Date 07/10/2006
Contractor P&S PLUMBING
Category 410 - Residential-Interior
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc. 2
Fixtures
Shower 1 Water Softner Wait. St. Shamp Sink
-
Floor Drain 1 Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal 1 Bidet Sculry Sink Wash Ftn
-
Dishwasher 1 Beer Tap Hand Sink Urinal
-
Sump Pump 1 Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
outside silcock
2
2
1
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
2 Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
NSFRI New single family 1 story with a 2 car attached garage and a 6' x 14' patio. The window within 2'-0" of the front door shall be
empered glass. Gas water heater.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1517050000
Use/Nature
of Work
Valuation
$6,200.00
$0.00
$119.00 0 PermitVoid~
Issued By Date 08/24/2006
Plan Approval
Permit Fees
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature ~ ~ /? 7/? #"' "2? Z t:;C; 3 Date Y / 2't I CJ t:-
AgenUOwner
Address PO BOX 2153
APPLETON
WI 54912 - 2153 Telephone Number 920-722-5035,920-7
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
.'
~
WATER CALCULATION WORKSHEET FOR
:Z3J~
3" tFPF l?1LJ. cJ/--
NAME/ADDRESS OF PROJECT
INFORMATION REQUIRED TO CALCULATE WATER SERVICE SIZE
1.
Demand of building in gallons per minute.
WSFU's / If
I J
lfi
= (GPM)
(feet)
2.
Difference in elevation from main or external pressure tank to building control valve.
3.
Size of the water meter. (When applicable)
5/8" 3/4" t/ 1" 1-1/2" 2" 3" 4" 6" .
-' -'-' -'-'-'-'-
4.
Developed length from main or external pressure tank to building control valve.
(feet) "p,
(psig) S 2.
5.
Low pressure at main in street or external pressure tank.
CALCULATE WATER SERVICE PRESSURE LOSS
6.
s-I.
Low pressure at main in street or external pressure tank. (value of # 5 above)
7.
I "
Water service diameter is
per 100 ft = III psi. X ." p
. Material is P LA-5::.n L . Pressure loss
(decimal equivalent of service length, i.e.; 65ft = .65)
~
(Subtract line 7. from line 6.)
subtotal L I .t;
8.
Determine pressure gain or loss due to elevation,
(multiply the value of # 2 above by .434) value of "8"
- c: ---
9.
Available pressure after the bldg. control valve. (Subtract or add line 8. Enter in "B".) subtotal
L{ f:,
CALCULATE THE PRESSURE AVAILABLE FOR UNIFORM LOSS (VALUE OF "A")
B.
L{,b
? j '5
L/~1 '5"
Available pressure after the bldg. control valve. (from "9" above)
Value of "B"
c.
Pressure loss of water meter (when meter is required or installed)
Value of "C"
(Subtract line C. from line B.) subtotal
D.
Pressure at controlling fixture.
(Controlling fixture is S /-.fc, U/6't1-
Value of "D" "2 CJ
)
(Subtract the value of D.) subtotal '2 '); .~
E.
Difference in elevation between the building control valve
and the controlling fixture in feet loX .434 psi/ft.
Value of "E" l.. ( I ~r...1
(Subtract the value of E.) subtotal J Of I I C.
F. Pressure loss due to water treatment devices, instantaneous
water heaters and backflow preventers which serve the
controlling fixture. Value of "F" - c ---
(Pressure loss due to )
(Subtract the value of F.) subtotal L q I I G
G. Developed length from building control valve to controlling
fixture in feet '7:J X 1.5
Value of "G" 113
subtotal "/,,c.;S
,
Multiply by 100
"A" = I (p,""I~
(Water distribution piping material is
fe-x
(Divide by the value of G.)
)
.,f-
A. Pressure available for uniform loss II H I, c. or' /1 d""1L
SBD -6479 (R8I02)
,"
Table 82.40 - 6 ("M" Copper)
1" - 34.0 w.s.f.u.
3/4" - 18.0 w.s.f.u.
1/2" - 6.5 w.s.f.u.
Table 82.40-9 (PEXPipe)
1" - 20.5 w.s.f.u.
3/4" - 11.0 w.s.f.u.
1/2" - 3.5 w.s.f.u.
Fixture #Fixtures w.s.f.u. total w.s.f.u.
Icemaker 1 0.5 0.5
1/2" Hose Bib 2 3.0 6.0
Kitchen Sink 1 1.5 1.5
Shower, Lav, Toilet 1 3.5 3.5
Dishwasher 1 1.0 1.0
Automatic Washer 1 1.5 1.5
Bathtub. Lav. Toilet 1 4.0 4.0
18.0w.s.f.u.