Loading...
HomeMy WebLinkAbout0121132-Plumbing (interior) o OSHKOSH ON THE WATER Job Address 641 W 8TH AVE CITY OF OSHKOSH No 121132 PLUMBING PERMIT - APPLICATION AND RECORD Owner ROLAND BUCK Create Date 06/15/2006 Plan Contractor O'NEILL ENTERPRISES INC Bathtub 2 Shower . Water Softner Whirlpool Floor Drain 1 Local Waste Lavatory 2 Lndry Tray 1 Clothes Wshr - - Toilet 2 Disposal 1 Bidet Res. Sink 1 Dishwasher 1 Beer Tap Bar Sink Sump Pump 1 Lab Sink Water Heater Classrm Sink Sterilizer Site Drain Breakrm Sink Dip Well Roof Drain Ejector/Grind Drink Ftn Misc. Fixtures Use/Nature NSFR / NEW HOME INTERIOR **debt acct of Work Category 410 - Residential-Interior Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink Flr/Wst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Sanitary Sewer Storm Sewer Water Service Material Type # Conn. Type Valuation $4,000.00 t5tnW $0.00 Parcelld # 0601210100 Plan Approval Issued By Permit Fees $105.00 D Permit Voided I Date 08/17/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W 6TH AVE OSHKOSH WI 54902 - 0000 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.