Loading...
HomeMy WebLinkAboutBuilding Y3-1981-0507 ~ OJHKOfH City of Oshkosh Division ofInspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 ON THE WATER . May 4, 2007 Stan Ramaker Design II Architechts, L TD 885 Western Ave Suite 200 Fond du Lac, WI54935 Jeff Kowalik Westowne North Properties 631 S Hickory St. Fond du Lac, WI 54935 Site: Plan Number: Y3-1981-0507 Armed Forces Recruitment Center L---1126, 1132, 1138, 1144 Emmers Ln Oshkosh, WI 54904 For: Description: Tenant Space Alterations Object Type: Bldg Only Class of Construction: VB 3375 Sq Ft.; Sprinklered Occupancy: B:Business non-separated use The submittal described above has been reviewed for confonnance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defmed in Chapter 101.01 (1 0), Wisconsin Statutes, is responsible for compliance with all code requirements. Key Item(s) · IBC 2406.2 Glazing in an individual fixed or operable panel adjacent to a door where the nearest exposed edge of the glazing is within a 24 inch arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60 inches above the walking surface is requires safety glazing materials. The windows in the office and test room in the Army suite will need to be glazed with safety glazing materials. · Comm 61.30(3) I IMC 507.2 This plan review does not include heating, ventilation, or air conditioning. HV AC plans are required to be submitted and approved prior to installation ofHV AC equipment. Be aware that IBe 1004.3.2.4 contains additional restriction for air movement in corridors · Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. Allrevisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with Comm 61.31(1). · Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional shall file a compliance statement form SBD-9720. I:\InspectionsIPlan Review\Commercial Plan Review 2007\y3- 198 I -0507 I 126-1 144 Emmers In bldg only. doc Page 1 of2 SUBMIT: . IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress are required to have adequate emergency lighting to meet the performance requirements ofIBC 1003.2.11.3. Provide complete emergency lighting plan showing compliance with these requirements prior to installation of emergency lighting system. It would appear that additional emergency lighting will be required to provide required light level in corridor and open office areas. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead. rian oe Building Systems Inspector. (920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M. bnoe@ci.oshkosh.wi.us cc: Property file Fee Required $ Fee Received $ Balance Due $ 390.00 390.00 0.00 I:\Inspections\Plan Review\Commercial Plan Review 2007\y3-1981-0507 1126-1144 Emmers In bldg only.doc Page 2 of2