HomeMy WebLinkAboutBuilding Y3-1981-0507
~
OJHKOfH
City of Oshkosh
Division ofInspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
ON THE WATER
. May 4, 2007
Stan Ramaker
Design II Architechts, L TD
885 Western Ave
Suite 200
Fond du Lac, WI54935
Jeff Kowalik
Westowne North Properties
631 S Hickory St.
Fond du Lac, WI 54935
Site: Plan Number: Y3-1981-0507
Armed Forces Recruitment Center
L---1126, 1132, 1138, 1144 Emmers Ln
Oshkosh, WI 54904
For:
Description: Tenant Space Alterations
Object Type: Bldg Only
Class of Construction: VB 3375 Sq Ft.; Sprinklered
Occupancy: B:Business non-separated use
The submittal described above has been reviewed for confonnance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defmed in Chapter
101.01 (1 0), Wisconsin Statutes, is responsible for compliance with all code requirements.
Key Item(s)
· IBC 2406.2 Glazing in an individual fixed or operable panel adjacent to a door where the nearest exposed
edge of the glazing is within a 24 inch arc of either vertical edge of the door in a closed position and where
the bottom exposed edge of the glazing is less than 60 inches above the walking surface is requires safety
glazing materials. The windows in the office and test room in the Army suite will need to be glazed with
safety glazing materials.
· Comm 61.30(3) I IMC 507.2 This plan review does not include heating, ventilation, or air
conditioning. HV AC plans are required to be submitted and approved prior to installation ofHV AC
equipment. Be aware that IBe 1004.3.2.4 contains additional restriction for air movement in corridors
· Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. Allrevisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31(1).
· Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720.
I:\InspectionsIPlan Review\Commercial Plan Review 2007\y3- 198 I -0507 I 126-1 144 Emmers In bldg only. doc
Page 1 of2
SUBMIT:
. IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress
are required to have adequate emergency lighting to meet the performance requirements ofIBC
1003.2.11.3. Provide complete emergency lighting plan showing compliance with these requirements
prior to installation of emergency lighting system. It would appear that additional emergency lighting
will be required to provide required light level in corridor and open office areas.
A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to
be obtained prior to commencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structure, or component.
Inquiries concerning this correspondence may be made to me at the number listed below or the address on this letterhead.
rian oe
Building Systems Inspector.
(920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M.
bnoe@ci.oshkosh.wi.us
cc: Property file
Fee Required $
Fee Received $
Balance Due $
390.00
390.00
0.00
I:\Inspections\Plan Review\Commercial Plan Review 2007\y3-1981-0507 1126-1144 Emmers In bldg only.doc
Page 2 of2