Loading...
HomeMy WebLinkAbout0124661-Building (porch) o OSHKOSH ON THE WATER Job Address 228 E PARKWAY AVE CITY OF OSHKOSH No 124661 BUILDING PERMIT - APPLICATION AND RECORD Owner GERARD J/L1NDA J STOECKERT Create Date 05/07/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature of Work SFRI Exterior remodeling< Repairing the existing front porch columns and headers will be made square and level. The windows will be emoved and then replaced once adjustments are made. The existing front steps will be widened by 24" and will reuse the existing stairs and landing. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Issued By: Date 05/07/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 0403260000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to se re an necessary approvals be re arting such activity. Date S --7.-0 ;7 Address 228 E PARKWAY AVE OSHKOSH WI 54901 - 4538 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.