HomeMy WebLinkAbout0124661-Building (porch)
o
OSHKOSH
ON THE WATER
Job Address 228 E PARKWAY AVE
CITY OF OSHKOSH No 124661
BUILDING PERMIT - APPLICATION AND RECORD
Owner GERARD J/L1NDA J STOECKERT Create Date 05/07/2007
Designer
Contractor OWNER
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature
of Work
SFRI Exterior remodeling< Repairing the existing front porch columns and headers will be made square and level. The windows will be
emoved and then replaced once adjustments are made. The existing front steps will be widened by 24" and will reuse the existing stairs
and landing.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$25.00 Park Dedication
$0.00
Issued By:
Date 05/07/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcel Id # 0403260000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se re an necessary approvals be re arting such activity.
Date
S --7.-0 ;7
Address 228 E PARKWAY AVE
OSHKOSH
WI 54901 - 4538
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.