Loading...
HomeMy WebLinkAbout0124608-Plumbing (kitchen sink) e . . OSHKOSH ON THE WATER Job Address 650 FOX FIRE DR CITY OF OSHKOSH No 124608 PLUMBING PERMIT - APPLICATION AND RECORD Contractor SAMMONS PLUMBING Category 410 - Residential-Interior Owner JAMES R/MOLL Y S OLSON Create Date 05/03/2007 Plan Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs SFR / Replace kitchen sink. ""DEBIT ACCT"". Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0657090000 Valuation Issued By $350.00 Plan Approval .~ $0.00 Permit Fees $25.00 0 Permit Voided I Date 05/03/2007 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Address 522 W. MURDOCK AVE Agent/Owner OSHKOSH Date WI 54901 - 2298 Telephone Number 231-9880 To schedule inspections please call the Inspection Request line at236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.