HomeMy WebLinkAbout0124596-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 1513 BISMARCK AVE
CITY OF OSHKOSH
No 124596
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RICHARD/KATHRYN HOFFMAN
Create Date 05/03/2007
Contractor SAMMONS PLUMBING
Category 411 - Residential-Water Heaters
Plan
Bathtub Shower Water Softner Wait. St. Shamp Sink
Whirlpool Floor Drain Local Waste Ice Chest FlrlWst Sink
Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin
Toilet Disposal Bidet Sculry Sink Wash Ftn
Res. Sink Dishwasher Beer Tap Hand Sink Urinal
Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec
Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker
Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain
Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp
Misc.
Fixtures
Use/Nature 'SFR / Replace gas water heater. ."DEBIT ACCT...
of Work
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0611090000
$25.00 0 Permit Voided I
Valuation
$600.00 Plan Approval
~
$0.00 Permit Fees
Issued By
Date 05/03/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this penn it application within an easement, the City strongly urges the pennit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 522 W. MURDOCK AVE
Agent/Owner
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.