Loading...
HomeMy WebLinkAbout0124550-Plumbing (laterals) . OS\:"iKOSH ON THE WATER Job Address 4411 ISLAND VI EW DR CITY OF OSHKOSH No 124550 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner CLASSIC HOMES BY KUBA Create Date 05/0212007 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor COATS, KEITH Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation NSFRI Sanitary sewer and water laterals. . Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New Storm Sewer Water Service 1-1/2" Plastic Lateral 1 New Parcelld # $12,000.00 Plan Approval $0.00 Permit Fees $100.00 0 Permit Voided I Issued By Date 05/0212007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure y necessary approvals before starting such activity. Signature 0 ~ Date ::;---;::-;2 - c;J 7 Agent/Owner Address 8424 SHIRLEY CT WINNECONNE WI 54986 - 9533 Telephone Number 920-582-3975 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.