Loading...
HomeMy WebLinkAbout0111920-Plumbing (added fixtures) o OSHKOSH ON THE WATER Job Address 2370 HICKORY CT rt;#) .""",._rlJ,::/ No PLUMBING PERMIT - APPLICATION AND RECORD ~" CITY OF OSHKOSH 111920 Owner SHIRLEY DOEMEL Create Date 12/07/2004 Contractor JIM'S PLUMBING & HEATING INC Category 410 - Residential-Interior Plan Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 - Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Lavatory 0 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 - - - - - Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 - Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 - - - - - - Bar Sink 1 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 - - Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 - - - Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 - - - Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Use/Nature of Work XTRA FXTS TO PERMIT 110476 RI FOR BAR SNK IN BASEMENT Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 Sanitary Sewer Storm Sewer Water Service Valuation $150.00 Plan Approval $0.00 Permit Fees o o o o o $20.00 D Permit Voided I Parcel Id # 1526191700 Issued By Date 12/07/2004 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address W6166 GREENVILLE DR Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-5258 To schedule inspections please call the Inspection Request line at 236-5128 npting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.