HomeMy WebLinkAbout0124536-Building (door/windows)
e
OSHKOSH
ON THE WATER
Job Address 510W MURDOCK AVE
CITY OF OSHKOSH No 124536
BUILDING PERMIT ...APPLlCATION AND RECORD
Owner KARA PROPERTIES LLC Create Date 04/26/2007
Designer
Omni Associates
Contractor FRED J PIETTE CO
Category
141 - Exterior Remodeling
Plan Y3-1977-0407
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height Ft.
o Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature Exterior Alterations as per Plans - Relocate doors, windows ( in existing openings - no structural changes ), reconstruct exterior elevation
of Work Inishes.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$78,000.00 Plan Approval
$0.00 Permit Fee Paid
$322.00 Park Dedication
$0.00
Issued By:
Date 05/01/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1218880000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address
3131 W SPENCER ST
APPLETON
WI 54914 - 4308
Telephone Number
920-739-5733
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.