Loading...
HomeMy WebLinkAbout0124520-Building (foundation) e OSHKOSH ON THE WATER Job Address 945 DOVE ST CITY OF OSHKOSH No 124520 BUILDING PERMIT - APPLICATION AND RECORD Owner JEAN B BORD Create Date 05/01/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Signs Garage Sq. Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature $FRI Repair west foundation* including excavating along the wall straighting the wall and backfilling with clear stone. Basement of Work Specialists will be doing the work. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,600.00 Plan Approval $0.00 Permit Fee Paid $60.00 Park Dedication $0.00 Issued By: ~ Date 05/01/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1601870000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder{s) and to~s re'any necessary ap,ovals before starting such activity. Signature _ g~8~ Date )'Co-/-i)? Agent/Owner Address 945 DOVE ST OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.