HomeMy WebLinkAbout0124505-Plumbing laterals)
o
OSHKOSH
ON THE WATER
Job Address 1200 INDIGO DR
CITY OF OSHKOSH No 124505
PLUMBING PERMIT - APPLICATION AND RECORD
Owner GLORIA BERNHARD Create Date 04/30/2007
Plan
Contractor BERNDT EXCAVATING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Category 430 - Industrial-Exterior (laterals)
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
EyeWash>Stat~
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Repair storm main and basins.
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer 12" Plastic Main 1 Repair
Water Service
Parcelld #
1307310100
Valuation
Issued By
Shower
Floor Drain
Lndry Tray
Dispos~L
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner Wait. St. Shamp Sink
Local Waste Ice Chest FlrlWst Sink
Clothes Wshr Exam Sink Catch Basin
Bidet Sculry Sink Wash Ftn
Beer Tap Hand Sink Urinal
Lab Sink Plaster Sink Standp Rec
Sterilizer Surgeons Sink Ice Maker
Dip Well F Prep Sink Gar Drain
Drink Ftn Serv Sink Soda Disp
Date 04/30/2007
$2,000.00 Plan Approval
$50.00 0 Pennit Voided I
In the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement hol r s) and to ec e aveces ryappro als before starting such activity.
Signature ,. ~
$0.00 Permit Fees
Address 2527 W WAUKAU AVE
AgenUOwner
OSHKOSH
WI 54904 - 0000 Telephone Number 235-3331
Date
c.; (' ~ () rD7
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.