Loading...
HomeMy WebLinkAbout0124505-Plumbing laterals) o OSHKOSH ON THE WATER Job Address 1200 INDIGO DR CITY OF OSHKOSH No 124505 PLUMBING PERMIT - APPLICATION AND RECORD Owner GLORIA BERNHARD Create Date 04/30/2007 Plan Contractor BERNDT EXCAVATING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Category 430 - Industrial-Exterior (laterals) Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve EyeWash>Stat~ Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Repair storm main and basins. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer 12" Plastic Main 1 Repair Water Service Parcelld # 1307310100 Valuation Issued By Shower Floor Drain Lndry Tray Dispos~L Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp Date 04/30/2007 $2,000.00 Plan Approval $50.00 0 Pennit Voided I In the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement hol r s) and to ec e aveces ryappro als before starting such activity. Signature ,. ~ $0.00 Permit Fees Address 2527 W WAUKAU AVE AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 235-3331 Date c.; (' ~ () rD7 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.