HomeMy WebLinkAbout0124463-Plumbing (water heater)
.
OSHKOSH
ON THE WATER
Job Address 45 E COUNTY RD Y
Contractor O'NEILL ENTERPRISES INC
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
124463
Owner TOM RUSCH CONSTRUCTION
Create Date 04/27/2007
Shower
Category 441 - Industrial-Water Heaters
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Plan
Wait. St.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
'Urinill
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
EyeWash Stat~
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Replace gas water heater serving multiple units.
of Work
Sanitary Sewer
Size
Storm Sewer
Water Service
Material
Type
#
Conn. Type
Parcelld #
$1,000.00 Plan Approval
$0.00 Permit Fees
$25.00 0 Permit Voided I
Valuation
Issued By
Date 04/27/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522 W 6TH AVE
OSHKOSH
WI 54902 - 5916 Telephone Number 920-230-2007
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.