Loading...
HomeMy WebLinkAbout0124463-Plumbing (water heater) . OSHKOSH ON THE WATER Job Address 45 E COUNTY RD Y Contractor O'NEILL ENTERPRISES INC CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 124463 Owner TOM RUSCH CONSTRUCTION Create Date 04/27/2007 Shower Category 441 - Industrial-Water Heaters Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Plan Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Shamp Sink FlrlWst Sink Catch Basin Wash Ftn 'Urinill Standp Rec Ice Maker Gar Drain Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve EyeWash Stat~ Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Replace gas water heater serving multiple units. of Work Sanitary Sewer Size Storm Sewer Water Service Material Type # Conn. Type Parcelld # $1,000.00 Plan Approval $0.00 Permit Fees $25.00 0 Permit Voided I Valuation Issued By Date 04/27/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W 6TH AVE OSHKOSH WI 54902 - 5916 Telephone Number 920-230-2007 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.