Loading...
HomeMy WebLinkAbout0124473-Plumbing (water heater) G OSHKOSH ON THE WATER Job Address 375 NEAGLE ST Contractor OSHKOSH AREA SCHOOL DISTRICT CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner OSH AREA SCHL DIST WEST HIGH Category 440 - Industrial-Interior Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink ., Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp No 124473 Create Date 04/27/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Install new gas water heater. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1608720100 Valuation $5,000.00 Plan Approval $0.00 Permit Fees $25.00 0 Permit Voided I Issued By Date 04/27/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) secu~ ny ne~? a~ls b~tarting such activity. ~ Signature /""'~ ~ Date~ ~?- Agent/Owner ~ Address PO BOX 3048 OSHKOSH WI 54903 - 0000 Telephone Number 424-0135 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.