Loading...
HomeMy WebLinkAbout0124455-Building (garage) G OSHKOSH ON THE WATER Job Address 143 CHURCH AVE CITY OF OSHKOSH No 124455 BUILDING PERMIT. APPLICATION AND RECORD Owner SCOTT C/NICOLE L BRAYTON Create Date 04/27/2007 Designer Contractor OWNER Category 150 - New Accessory Buildings-Garages (Residential) Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Canopies Finished/Living Bedrooms Stories Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature jSFRI Renewal/ Constructing a 17' x 20' detached garage and 3 off street parking stalls. The walls facing the house and rear property of Work ;lines shall be 1 hour fire rated construction (5/8" Type X drywall). Plumbing Contractor HV AC Contractor Electric Contractor $3,700.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 04/27/2007 Final/D.P. 00/00/0000 o Permit Voided I Parcelld # 0701440000 In the performance of ~hiswork I agree to perform all work pursuant to rules governing the described construction. While the City of oShkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work ; described in this p~rmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec~~ an~..nece~. ry~pr~vals before starting such activity. Signature}'-.. l/'ii( /}'! C Date 'JI ,,/. / Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.