HomeMy WebLinkAbout0124455-Building (garage)
G
OSHKOSH
ON THE WATER
Job Address 143 CHURCH AVE
CITY OF OSHKOSH No 124455
BUILDING PERMIT. APPLICATION AND RECORD
Owner SCOTT C/NICOLE L BRAYTON Create Date 04/27/2007
Designer
Contractor OWNER
Category
150 - New Accessory Buildings-Garages (Residential) Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Size
Unfinished/Basement
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Canopies
Finished/Living
Bedrooms
Stories
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature jSFRI Renewal/ Constructing a 17' x 20' detached garage and 3 off street parking stalls. The walls facing the house and rear property
of Work ;lines shall be 1 hour fire rated construction (5/8" Type X drywall).
Plumbing Contractor
HV AC Contractor
Electric Contractor
$3,700.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
~
Date 04/27/2007
Final/D.P. 00/00/0000
o Permit Voided I
Parcelld # 0701440000
In the performance of ~hiswork I agree to perform all work pursuant to rules governing the described construction.
While the City of oShkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
;
described in this p~rmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to sec~~ an~..nece~. ry~pr~vals before starting such activity.
Signature}'-.. l/'ii( /}'! C Date 'JI
,,/. / Agent/Owner
Address
Oshkosh
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.