Loading...
HomeMy WebLinkAbout0122483-Building (patio) de OSHKOSH ON THE WATER Job Address 2255 HICKORY CT CITY OF OSHKOSH No 122483 BUILDING PERMIT - APPLICATION AND RECORD Owner KIMBERLY A OTTE Create Date 11/10/2006 Designer Contractor CLASSIC HOMES BY KUBA L TD Category 142 - Decks, Patios, Ramps Plan . Building o Sign o Canopy o Fence o Raze Type Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Sq.Ft. Bedrooms Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FR/ LATE PERMIT/Installation of a concrete patio in the rear yard. The patio is required to maintain 75' to the ordinary high water of Work ~ark. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~r $1,000.00 Plan Approval $0.00 Permit Fee Paid $125.00 Park Dedication $0.00 Date 11/10/2006 Final/O.P. 00/00/0000 D Permit ~oided I Parcelld # 1526190400 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t e re any necessary app' ovals before starting such activity. Date '(f I )1.0 / Dh Signatur Address PO BOX 738 OSHKOSH WI 54903 - 0738 Telephone Number 426-8600 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. - ::r.:J ::-ri / / t t ., / ---------.---....--.-..---..--.---.. :'O-h -..-..---..-......-...............-..--.---..-------j ~;-) \../' /" ./ ~~.:::~;~-r~lL' [J'D ~~)