Loading...
HomeMy WebLinkAbout0124347-Building e OSHKOSH ON THE WATER Job Address 1932 MENOMINEE DR CITY OF OSHKOSH No 124347 BUILDING PERMIT - APPLICATION AND RECORD Owner ROBERT L WESTON Create Date 04/23/2007 Contractor TOM WILLIAMS BUILDING CONTRACTOR Designer Category 140 -Interior Remodeling Plan Zoning . Building o Sign o Canopy o Fence o Raze Type Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FRI Bathroom remodel* on the 2nd floor. No walls will be moved and no structural alterations are needed. of Work HV AC Contractor Plumbing Contractor KURT ZENTNER & SONS INC Electric Contractor WITZKE ELECTRIC INC Fees: Valuation $6,000.00 Plan Approval $0.00 Permit Fee Paid Issued By: O(f $60.00 Park Dedication $0.00 Date 04/23/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1512440000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application wi an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to re any necess . g such activity. Date Signature Address 501 IOWA S OSHKOSH WI 54902 - 5933 Telephone Number 233-7817 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.