Loading...
HomeMy WebLinkAbout0124376-Building (roof) o OSHKOSH ON THE WATER Job Address 414 ANNEX AVE CITY OF OSHKOSH No 124376 BUILDING PERMIT - APPLICATION AND RECORD Owner RICHARD A1SUSAN M STADLER Create Date 04/23/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation o Poured Concrete 0 Floating Slab o Pier . Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Reroof - Tear off existing, install new felt, flashings, vents and shingles. * Contractor is Above All Construction (Fond du Lac.) of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valua $3,700.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: Date 04/23/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1208580000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly iJrges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~(1J M ) ~A ~/L, Date if r:J.3 -0 '7 Agent/Owner Address 414 ANNEX AVE OSHKOSH WI 54901 - 2920 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.