Loading...
HomeMy WebLinkAbout0124362-Building e OSHKOSH ON THE WATER Job Address 706 W 1 OTH AVE CITY OF OSHKOSH No 124362 BUILDING PERMIT -APPLICATION AND RECORD Owner LYLE E KOCH LIFE ESTATE Create Date 04/23/2007 Designer Contractor LEACH BROS. Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature ~FRI Bathroom remodel> to include converting the existing bedroom into a bathroom and replacing the stairs with a spiral staircase. 2 of Work ~indows will be closed in. HV AC Contractor ANDRESEN SHEET METAL Plumbing Contractor KOCH PLUMBING Electric Contractor SECKAR ELECTRIC CO INC Fees: Valuation $14,000.00 Plan Approval $0.00 Permit Fee Paid $112.00 Park Dedication $0.00 Issued By: ~ \ Date 04/23/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1303990000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur y necessary approvals before starting such activity. .f" " t/ Date ,--( ~;2~/o Signature Address 2883 RUSCHFIELD DR Agent/Owner Oshkosh WI 54904 - 0000 Telephone Number 420-5005 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.