HomeMy WebLinkAbout0124328-Plumbing (water heater)
o
OSHKOSH
ON THE WATER
Job Address 923 BISMARCK AVE
CITY OF OSHKOSH
No 124328
PLUMBING PERMIT - APPLICATION AND RECORD
Owner CHARLES J/KIM DANULA TRUST
Create Date 04/20/2007
Contractor SOPER PLUMBING
Category 411 - Residential-Water Heaters
Plan
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
. '. " - .~., . .
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Replace gas water heater. **debit acct
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0604830000
Valuation
$600.00 Plan Approval
Issued By
$0.00 Permit Fees
$25.00 0 Permit Voided I
Date 04/20/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 2225 BURNWOOD DR
OSHKOSH
WI 54902 - 0000 Telephone Number 426-2151
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.